Check whether the system suits the building
TPO selection needs to account for deck condition, insulation, drainage and existing details. Secure-Toît uses only 60 mil TPO for its TPO replacement work.
Considering a white TPO membrane? The project is defined by the deck, insulation, slopes and connections, as well as the roof covering. Secure-Toît uses only 60 mil membrane for its TPO work.
TPO selection needs to account for deck condition, insulation, drainage and existing details. Secure-Toît uses only 60 mil TPO for its TPO replacement work.
The membrane from IKO, a Canadian company, forms part of an assembly suited to the project. Clarify components, attachment and compatible accessories; the membrane brand alone does not describe the complete system.
Hot-air welding joins membrane sections. Settings, preparation and crew checks remain essential, including when automated equipment is used. Drains, vents and parapets require details suited to their configuration.
For your project in Saint-Calixte, access, deck condition and the details involved can change the work needed. Ask for these points to be specified in the proposal.
Read the full service guideFor a building in Saint-Calixte, the municipal authority is Saint-Calixte. The government directory lists it under MRC Montcalm. Check requirements with this municipality’s planning department, providing the address and actual scope of work.
Ask whether changes to the covering, structural or insulation work, heritage restrictions or use of the street affect the documents needed. Requirements must be checked for the specific building and proposed work.
Territorial references: MAMH, Québec municipal directory (CC-BY 4.0), accessed November 2, 2026. Permit requirements must be confirmed with the municipality. View the directoryExplore white 60 mil TPO, an assembly over steel decking, automated welding and prefabricated accessories. Design and details are adapted to the building.
Explore our TPO systemInclude Saint-Calixte, the full address, phone number and service you need. Add relevant observations and access constraints. The request page automatically carries over your chosen area and service.
No. Roof area, deck, access, equipment and agreed work need to be assessed. Availability is confirmed by the team; this page does not reserve an intervention time.