Montréal · Laval · North Shore · South ShoreA leak? Call 514 556-2864
OUR SERVICES

A commercial roof. A project to coordinate.

On a commercial building, the roof also protects the activities taking place beneath it. Planning needs to consider the existing assembly, rooftop equipment, access and occupants. Secure-Toît can discuss a 60 mil TPO replacement with you and help define a scope suited to the building, its condition and the work that needs to be coordinated.

Corrugated steel roof deck0504Vapour retarder03Insulation02Cover board01White TPO · 60 milPrinciple diagram, not to scale.
Last chance: up to 23% off.Your roof before 2027. Call for offer details and availability.
00days
00hours
00min
00sec
Call now514 556-2864

From steel deck to membrane

A roof assembly over steel deck contains several layers, with the composition varying by project. Deck and fastener condition, vapour control, insulation and cover boards influence system selection. Our technical illustration explains these roles but does not replace the design for your building. Suspected deterioration or changes affecting the structure require an appropriate assessment before the scope is finalized.

Address details around rooftop equipment

Mechanical equipment curbs, vents, drains and parapets create numerous junctions to address. Prefabricated accessories and hot-air welding are part of our TPO approach. Heights, connections and access need to be checked so details remain compatible with existing components and the agreed work. Automated welding equipment supports the installation process, while the crew remains responsible for setup and verification.

Plan around the building’s occupants

Tell us about operating hours, sensitive areas, delivery access and planned work by other trades. Material handling, site protection and debris removal can then be coordinated accordingly. In an occupied building, communication and work sequencing are part of preparation, just like material selection. Any restrictions on operations should be discussed before agreeing on the project schedule.

Explore the assembly and technical details

60 mil TPO, Leister automated welding and prefabricated accessories: discover how the elements work together.

Explore our TPO system
Answers to your questions

Before you start.

Can the business stay open during the work?

That depends on the work, access and building activities. Operating constraints need to be understood before planning the sequence; uninterrupted use of every area should not be assumed.

Do you always replace the steel deck?

No. Its condition and the project requirements need to be assessed. Components to retain or replace are identified from the findings and any further checks that are needed.

What should I prepare for a quote?

The address, building use, available plans, leak history and access restrictions are useful. Include planned work on rooftop equipment or in the spaces directly beneath the roof.

LET’S START WITH A CONVERSATION

Your roof deserves a clear answer.

A leak, questions or a project to plan? Tell us what is happening.

Call 514 556-2864Get a quote
Enlarged Secure-Toît project