Describe the water accumulation
Identify where water repeatedly collects and the conditions observed, without climbing onto the roof. Mention known drains, interior leaks and work that has altered the roof.
A flat roof is not intended to leave water without a route to an outlet. If you notice recurring pooling, its cause should be assessed before selecting a correction. Drainage must be considered alongside slopes, outlets, obstacles and deck condition. Installing a new membrane does not automatically change how water moves across the roof.
Identify where water repeatedly collects and the conditions observed, without climbing onto the roof. Mention known drains, interior leaks and work that has altered the roof.
The assessment distinguishes an outlet obstruction, insufficient slope and a possible deck issue. Equipment, upstands and available heights influence which corrections can be considered.
Tapered insulation may suit some projects, depending on the selected assembly. Ask how the proposal directs water and treats junctions; a structural alteration requires an appropriate assessment.
For your project in Town of Mount Royal, access, deck condition and the details involved can change the work needed. Ask for these points to be specified in the proposal.
Read the full service guideThis page concerns the Town of Mount Royal, a separate municipality from Montréal’s Le Plateau-Mont-Royal borough. Provide the correct municipality with the building address when planning the work and checking requirements.
Ask whether changes to the covering, structural or insulation work, heritage restrictions or use of the street affect the documents needed. Requirements must be checked for the specific building and proposed work.
Territorial references: MAMH, Québec municipal directory (CC-BY 4.0), accessed November 2, 2026. Permit requirements must be confirmed with the municipality. View the directoryInclude Town of Mount Royal, the full address, phone number and service you need. Add relevant observations and access constraints. The request page automatically carries over your chosen area and service.
Not by itself. The membrane provides the waterproofing surface; water flow also depends on slopes, the deck and outlets. These components need to be considered together.
No. Roof area, deck, access, equipment and agreed work need to be assessed. Availability is confirmed by the team; this page does not reserve an intervention time.