Define what needs replacement
Review the membrane, deck, insulation and outlets. A clearly defined replacement identifies the layers to remove or retain and the conditions that still need confirmation.
Replacing a flat roof involves more than installing a new membrane. The deck, insulation, vapour control, slopes and waterproofing details all contribute to the result. Secure-Toît uses a white 60 mil TPO membrane for its TPO replacement work in Greenfield Park, with the assembly selected to suit the building and the project.
Review the membrane, deck, insulation and outlets. A clearly defined replacement identifies the layers to remove or retain and the conditions that still need confirmation.
Consider slopes, drains, parapets and penetrations together. For TPO replacement, Secure-Toît uses a white 60 mil membrane; the assembly is selected to suit the building.
Clarify access, material handling, debris removal and communication with occupants. After completion, retain the project documents and applicable maintenance guidance.
For your project in Greenfield Park, access, deck condition and the details involved can change the work needed. Ask for these points to be specified in the proposal.
Read the full service guideGreenfield Park is a borough of Longueuil. Include the borough and full address in permit enquiries and your quote request to distinguish the property from those in other municipalities in the agglomeration.
Ask whether changes to the covering, structural or insulation work, heritage restrictions or use of the street affect the documents needed. Requirements must be checked for the specific building and proposed work.
Territorial references: MAMH, Québec municipal directory (CC-BY 4.0), accessed November 2, 2026. Permit requirements must be confirmed with the municipality. View the directoryExplore white 60 mil TPO, an assembly over steel decking, automated welding and prefabricated accessories. Design and details are adapted to the building.
Explore our TPO systemInclude Greenfield Park, the full address, phone number and service you need. Add relevant observations and access constraints. The request page automatically carries over your chosen area and service.
It is the thickness selected for our TPO replacement work, approximately 1.52 mm. Roof performance also depends on the complete assembly, installation and treatment of details.
No. Roof area, deck, access, equipment and agreed work need to be assessed. Availability is confirmed by the team; this page does not reserve an intervention time.